Performing a Volume Transfer
B
B
Loading the Stage
Resource Check
About five seconds after the load flap is closed, the MagNA Pure 96 Instrument locks it and starts the re-
source check.
The resource check ensures that
All required accessories for the defined run are present.
All required disposables for the defined run are present and valid.
There is enough system fluid for a run of 96 samples.
There is enough capacity in the waste container for a run of up to 96 samples.
If during the resource check the MagNA Pure 96 Instrument detects that an accessory or disposable is
missing, invalid, or in the wrong position, a message is displayed. For more information on the resource
check, see chapter "Software" in the "MagNA Pure 96 Operator’s Guide".
The error message is displayed in the corresponding graph on the Stage sub-tab of the MagNA Pure 96
Software. The graph on the Stage sub-tab is color-coded:
After the resource check, the MagNA Pure 96 Instrument unlocks the load flap. If positions on the Stage
sub-tab are displayed in yellow or red, proceed as follows:
The MagNA Pure 96 Instrument then checks only the rearranged rack.
Yellow The accessory or disposable is missing.
Red The accessory or disposable is invalid or in the wrong position. For more information
on troubleshooting the relevant messages, see chapter "Troubleshooting" in the
"MagNA Pure 96 Operator’s Guide".
Open the load flap of the MagNA Pure 96 Instrument.
Pull the relevant rack all the way out of the stage.
Rearrange or exchange the relevant components as recommended on the Stage sub-tab.
Insert the rack back into the stage.
Press the rack into the stage until its outline is displayed in blue on the Stage sub-tab.