EasyManua.ls Logo

Roche URISYS 2400 - Initial Preparations and System Start

Roche URISYS 2400
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Operators Manual · Version 1.0 C-3
URISYS 2400 5 Daily operation
Initial preparations
Initial preparations
Before switching on the power to operate the analyzer, perform the following
tasks:
o Fill the water supply tank with deionized water and place the liquid level
detector in the water supply tank.
o Ensure that the TS transfer base is inserted correctly.
o Empty the strip waste container and ensure that it is positioned correctly.
o Empty the liquid waste tank.
o Place an empty rack tray on the rack output line.
o Remove all air bubbles from the syringes after switching on the analyzer.
Air purge on page D-7

Table of Contents

Related product manuals