Roche Diagnostics
Operator’s Manual · Version 1.0 C-3
URISYS 2400 5 Daily operation
Initial preparations
Initial preparations
Before switching on the power to operate the analyzer, perform the following
tasks:
o Fill the water supply tank with deionized water and place the liquid level
detector in the water supply tank.
o Ensure that the TS transfer base is inserted correctly.
o Empty the strip waste container and ensure that it is positioned correctly.
o Empty the liquid waste tank.
o Place an empty rack tray on the rack output line.
o Remove all air bubbles from the syringes after switching on the analyzer.
“Air purge” on page D-7