Rockwell Automation Publication 750-IN119A-EN-P - April 2022 25
Chapter 3
Prepare for Installation
CE Conformity Compliance with the Low Voltage Directive and Electromagnetic
Compatibility Directive has been demonstrated using harmonized European
Norm (EN) standards, which are referenced by the Official Journal of the
European Union. PowerFlex® 755TS products comply with the EN standards
that are listed in this section when installed according to these installation
instructions.
EU Declarations of Conformity are available online at: rok.auto/certifications.
Low Voltage Directive (LVD)
• EN 61800-5-1 Adjustable speed electrical power drive systems – Part 5-1:
Safety requirements – Electrical, thermal and energy.
EMC Directive
• EN 61800-3 Adjustable speed electrical power drive systems – Part 3: EMC
product standard including specific test methods.
General Considerations
• For EU compliance, drives must satisfy installation requirements that
are related to both EN 61800-5-1 and EN 61800-3 provided in this
document.
• PowerFlex 755TS products comply with the EMC requirements of EN
61800-3 when installed according to good EMC practices and the
instructions that are provided in this document. However, many factors
can influence the EMC compliance of an entire machine or installation,
and compliance of the drive itself does not ensure compliance of end user
applications.
• PowerFlex 755TS products are not intended to be used on public low-
voltage networks that supply domestic premises. Without additional
mitigation, radio frequency interference is expected if used on such a
network. The installer is responsible to take measures such as
supplementary line filters and enclosures to prevent interference, and
the installation requirements of this document.
• Requirements for supplementary mitigation that is related to specific
high-frequency emission limits are provided in Table 2
.
• PowerFlex 755TS products generate harmonic current emissions on the
AC supply system. When operated on a public low-voltage network it is
the responsibility of the installer or user to ensure that applicable
requirements of the distribution network operator have been met.