EasyManua.ls Logo

Rohde & Schwarz R&S ZNA Series - Page 884

Rohde & Schwarz R&S ZNA Series
1849 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GUI reference
R&S
®
ZNA
884User Manual 1178.6462.02 ─ 29
The available GUI elements for the limit line definition are the same as in the general-
purpose limit line setup dialog. For their description, see Chapter 5.6.1.2, "Define Limit
Lines dialog", on page 482.
Prompt before every port check
This option comes in handy if you want to connect a particular device such as a reflec-
tion standard to the related port before you execute or repeat the test.
Execute/Repeat
Executes or repeats the "Active" port power tests with their current limit line and power
level settings. The firmware displays the relevant a- and b-wave traces, limit lines and
PASS/FAIL results and in the diagram area:
The PASS/FAIL results are also written to the Log area.
Remote command:
SYSTem:OPCHeck:PLEVel:PORT<Port>?
Setup softtool

Table of Contents

Related product manuals