GUI Reference
R&S
®
ZNB/ZNBT
456User Manual 1173.9163.02 ─ 53
Figure 6-26: SMARTerCal (Cal Unit), Step 2: Connections (single)
Figure 6-27: SMARTerCal (Cal Unit), Step 2: Connections
Related information
Refer to Chapter 5.5.5.4, "Multiple Port Assignments", on page 172 for details on multi-
ple port assignments.
Port Assignment (manual)
The "Connections" step allows you to configure the assignments between VNA ports
and calibration unit ports manually.
Cal Softtool