EasyManua.ls Logo

Rohde & Schwarz R&S ZVA 8 - Page 155

Rohde & Schwarz R&S ZVA 8
813 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R&S
®
ZVA/ZVB/ZVT Calibration Overview
1145.1084.12 3.45 E-1
ZV-Z58: Number of ports calibrated Calibration type
1 (port 1 or port 2) Full one port
2 (ports 1 and 2) TOSM
3 (ports 1, 2, and 3 or ports 1, 2, and 4) TOSM
4 (ports 1 to 4) TOSM
5 (ports 1 to 5) TOSM
6 (ports 1 to 6) TOSM
7 (ports 1 to 7 or ports 1 to 6 and port 8) TOSM
8 (ports 1 to 8) TOSM
Messages during the calibration process
The automatic calibration is started on clicking Calibration Unit in the Start Calibration menu. When the
test port connectors in the Port Configuration dialog do not fit to the connectors of the calibration unit, a
warning appears:
OK changes the connector type assignment of the test ports and starts the calibration. A popup box
shows the progress of the calibration procedure.
The box is closed automatically when all standards have been measured, the system error correction
data have been calculated, and the result is applied to the active channel. The network analyzer is
ready to perform calibrated measurements.
Remote control:
[SENSe<Ch>:]CORRection:COLLect:AUTO.
[SENSe<Ch>:]CORRection:COLLect:AUTO:PORTs.

Table of Contents

Related product manuals