EasyManua.ls Logo

Rohde & Schwarz R&S ZVA 8 - Page 368

Rohde & Schwarz R&S ZVA 8
813 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Channel Menu R&S
®
ZVA/ZVB/ZVT
1145.1084.12 4.206 E-6
Measure Standards
The last dialog of the calibration wizard is used to perform the necessary measurements of standards
and to calculate the correction data.
Measure Standards displays the list of measured standards compiled in the previous dialogs. The list is
complete: All standards must be measured to perform the selected calibrations.
Structure of the Measured Standards list
The list of measured standards has a tree structure.
The first level contains all physical ports where one-port
(reflection) measurements are
required and all physical port combinations where two-port
(transmission) measurements
must be performed.
The second level contains check boxes for the standards to be measured at each port or port
combination.
For a sliding match, a third level contains check boxes for 7 different positions of the sliding
element. The sliding load must be measured at 3 to 7 different positions which should be
unequally spaced to avoid overlapping data points.
Double-click a physical port symbol to expand or collapse the list.
Checking one of the boxes in the list causes the analyzer to stop the measurement in all channels
except the active one and measure the standard according to the active channel settings. The progress

Table of Contents

Related product manuals