Getting Started
R&S
®
SMW200A
81User Manual 1175.6632.02 ─ 16
4. To apply frequency and power offsets to the signals, select "Baseband B > Base-
band Offsets".
a) Enter "Baseband A > Frequency Offset > 5 MHz".
b) Enter "Baseband B > Frequency Offset > -5 MHz".
c) Enter "Baseband B > Path Gain > -30 dB".
d) Close the "Baseband Offsets" dialog.
The symbols and in the block diagram confirm that the signals are added
weighted with a frequency offset on both paths and a path gain on path B.
Figure 2-12: Block diagram: Generating a composed signal (stream A)
To enable simultaneous signal generation in both basebands, the R&S SMW cou-
ples the trigger settings in the available basebands. The trigger settings enabled in
"Baseband A" apply automatically to the "Baseband B".
The symbol confirms that common trigger settings are applied.
Trying Out the Instrument