EasyManua.ls Logo

Rohde & Schwarz ZNB - Page 455

Rohde & Schwarz ZNB
1498 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GUI Reference
R&S
®
ZNB/ZNBT
455User Manual 1173.9163.02 ─ 54
Figure 6-25: SMARTerCal (Cal Unit), Step 2: Connections (single)
Figure 6-26: SMARTerCal (Cal Unit), Step 2: Connections
Related information
Refer to Chapter 5.5.5.4, "Multiple Port Assignments", on page 173 for details on multi-
ple port assignments.
Port Assignment (manual)
The "Connections" step allows you to configure the assignments between VNA ports
and calibration unit ports manually.
The R&S ZNB/ZNBT always proposes an optimum solution (minimum number of
assignments) that also minimizes the physical port reconnections required between
calibration stages. For user-modified assignments, it provides assistive information
indicating insufficient, or redundant entries.
Cal Softtool

Table of Contents

Other manuals for Rohde & Schwarz ZNB

Related product manuals