EasyManua.ls Logo

Rohde & Schwarz ZNB - Page 60

Rohde & Schwarz ZNB
1498 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Getting Started
R&S
®
ZNB/ZNBT
60User Manual 1173.9163.02 ─ 54
2. Select the adequate drop position, depending on whether you want to display the
new trace in the existing diagram, or whether you want to add a new diagram. The
highlighted area indicates the target diagram.
3. In the dialog box that is opened when you release the "New Trace" icon, select the
S-parameter to be measured.
For a four-port analyzer:
The R&S ZNB/ZNBT generates a new trace for the selected S-parameter.
Operating the Instrument

Table of Contents

Other manuals for Rohde & Schwarz ZNB

Related product manuals