EasyManua.ls Logo

Rohde & Schwarz ZVB 4 - Replacing Generator and Receiver Cover (R&S ZVB4;8 Only)

Rohde & Schwarz ZVB 4
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instrument Construction and Function Description R&S ZVB
1145.1078.82 3.44 E-4
Replacing Generator and Receiver Cover (R&S ZVB4/8 only)
(
See Service Circular 10028 and Chapter 5, Spare Parts List, Items 130, 150 and
d
rawing
1302.4960.08)
Opening the instrument and removing the cover
Remove the Reflectometer (see chapter Replacing a Reflectometer RM8 A510 to A540)
Remove the RM mount (200), 4 Screws (210)
Remove the covers (130, 150)
Installing the cover and reassembling the instrument
Fit the new covers (130, 150)
Refit the RM mount (200)
Reinstall the Reflectometer (see chapter Replacing a Reflectometer RM8 A510 to A540)
Connect the mains cable and turn on at the mains switch. The instrument is now in the standby
mode
Select Service Level 2 (see Service Functions).
When the instrument has been started, check the protocol file for errors:
[ INFO : Error Log ]
Record the receiver correction data (see Recording Correction Values).
Perform the factory system error calibration (see Factory System Error Calibration).

Table of Contents

Related product manuals