EasyManua.ls Logo

Rosenbauer DIGIDOS 24 AT - Requirements for Foam Operation

Rosenbauer DIGIDOS 24 AT
56 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Seite - 47 -
04.10.2008 / LSV - JWh/ Rev. 02
DIGIDOS 24 AT
© 2008
OPERATION
Operation
3.3 Operation
3.3.1 Requirements for Foam Operation
- Commissioning the water pump
IMPORTANT!
The operating instructions of the pump manufacturer
absolutely must be heeded.
- Press „FOAM“ on the display.
- Check whether there is a sufficient supply of foam compound
in the foam compound tank (display).
- Use function key F1 to select the „Direct-injection foam
proportioner“.
- Use function keys F2 „+%“ and F3 „-%“ to select the
proportioning rate.
- Use function key F4 to select from where the foam compound
is to be drafted: „TANK A“, „TANK B“ or „EXTERNAL
DRAFTING“.
- Use the Enter key „
“ to confirm the selection
- Open pressure outlets
- Set the pump pressure (pump operation) to the desired
value.
Foam
Direct-injection foam
proportioner
Enter

Table of Contents

Related product manuals