Page - 116 -
FLF 15000/1800/500
Panther 8x8 CA-7
© 2014
Repetitive Test Cycle
Repetitive Test Cycle for Electrical Components
Repetitive tests are only to be carried out by certified electricians.
These tests are to be carried out according to the specifications listed in the component test manual.
Electrical systems (230 volts / 400 volts) are to be tested regularly.
1
st
test at 3 years
2
nd
test at 2 years after 1
st
test
3
rd
test and further tests every year after that
- Alternators are to be tested for at least 1 hour every six months at least 50% of nominal capacity, or if not,
at least with the maximum allowed permanent engine rpm.
- All carried out certifications and tests are to be recorded in a logbook.
The installed FI protection is to be tested under load every six months (press test button on the FI protection).