Page - 79 -
FLF 15000/1800/500
Panther 8x8 CA-7
© 2014
Z102
Z105 J99
Rapid Intervention System
J106
CAUTION !
Before opening a handline discharge valve make sure that the
nozzles are held tightly - danger of water hammer effect!
Release pressure before disconnecting hose!
Rapid intervention system
Operation with water
- Operate the pump as mentioned in the
◊
"Manual Pump Operation" or
◊
"Tank Suction Operation" or
◊
"Drafting Operation from Open Water Source" or
◊
"Hydrant / Supply Operation" pump panel operation chapter.
Foam operation
- Operate the pump as mentioned in the
◊
"Foam Operation" pump panel operation chapter.
◊
Provide nozzle with a foam extension (J98).
- Release hose reel brake (Z102).
- Lift the hose guide frame (26) to top position. *
- Remove nozzle (J99) from stowage, pull out length of hose
desired and lock brake (Z102) again.
- Open the hose reel discharge valve (J106).
- To provide easier hose reel access from the direction of the fire
the hose reel frame can be swivelled forward by 45
°
and 90
°
,
using lever (Z105). Ensure the hose reel frame is locked
afterwards.
Note:
For best foam quality, operate pumping installation with pressure
more than 6 bar!
Before closing the roller shutter swivel down the hose guide frame
(26). *