EasyManua.ls Logo

Rosenbauer FLF 15000 PANTHER - Page 79

Rosenbauer FLF 15000 PANTHER
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page - 79 -
FLF 15000/1800/500
Panther 8x8 CA-7
© 2014
Z102
Z105 J99
Rapid Intervention System
J106
CAUTION !
Before opening a handline discharge valve make sure that the
nozzles are held tightly - danger of water hammer effect!
Release pressure before disconnecting hose!
Rapid intervention system
Operation with water
- Operate the pump as mentioned in the
"Manual Pump Operation" or
"Tank Suction Operation" or
"Drafting Operation from Open Water Source" or
"Hydrant / Supply Operation" pump panel operation chapter.
Foam operation
- Operate the pump as mentioned in the
"Foam Operation" pump panel operation chapter.
Provide nozzle with a foam extension (J98).
- Release hose reel brake (Z102).
- Lift the hose guide frame (26) to top position. *
- Remove nozzle (J99) from stowage, pull out length of hose
desired and lock brake (Z102) again.
- Open the hose reel discharge valve (J106).
- To provide easier hose reel access from the direction of the fire
the hose reel frame can be swivelled forward by 45
°
and 90
°
,
using lever (Z105). Ensure the hose reel frame is locked
afterwards.
Note:
For best foam quality, operate pumping installation with pressure
more than 6 bar!
Before closing the roller shutter swivel down the hose guide frame
(26). *