EasyManua.ls Logo

Rosenbauer FLF 15000 PANTHER - Pump System Drainage

Rosenbauer FLF 15000 PANTHER
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page - 97 -
FLF 15000/1800/500
Panther 8x8 CA-7
© 2014
Maintenance
Drainage of the Pump System / Operation in Cold Climates
To protect the fire fighting unit from damage by corrosion and
freezing water make sure to drain the entire pump system (espe-
cially at temperatures below 0
°
Celsius).
- Drain the entire pump system:
Press switch (S69).
The discharge valves of the roof turret, bumper turret and
undertruck nozzles will be automatically opened.
Remove blind coupling of water drafting connection (J15).
Remove blind coupling of the foam compound drafting
connection (J47) and open the foam compound drafting
valve.
Press switch (S53).
Open drain valve (J167). *
Press switch (S12).
Remove blind coupling of pressure outlets (J11) or discon-
nect the pressure hoses.
Remove blind coupling of pressure outlet (J11h) or discon-
nect the pressure hose. *
Open the left discharge valves (J10).
Press switch (S44) longtime. *
- Open manometer flushing valves (J164) placed behind the
gauges.
- Wait until the pump system is drained.
- Drainage of the left hose reel:
Please refer to the "Rapid Intervention System" chapter.
- Drainage of left tank fill line:
Open drain valve (J167). *
Remove blind couplings of tank fill connections (J30).
Open tank fill valves (J29).
Press switch (S35M) until the fill pipes are empty. *
- Operate all ball valves several times; keep ball valves in half
open position to allow drainage of the valve casing.
- Close all pressure outlets and drain valves, secure with blind
couplings.
3%
8%
S69 S12S53
CAUTION !
Release pressure before disconnecting a hose!
J10
J29 J30 J29 J47 J11 J10
J11
J15