EasyManua.ls Logo

Rotary Inbay SL210i User Manual

Default Icon
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
I
N
S
T
A
L
L
A
T
I
O
N
I
N
S
T
R
U
C
T
I
O
N
S
I
N
S
T
A
L
L
A
T
I
O
N
I
N
S
T
R
U
C
T
I
O
N
S
IN20481
Rev. C 2/4/2010
LP20447
SL210i/SL212i
Compact Inbay Control
(800 Series) (1Ø & 3Ø 208V-240V) (3Ø 480V)
SL210i Moveable Pad Capacity 8,000 lbs.
SL210i Capacity 10,000 lbs.
SL212i Capacity 12,000 lbs.
© February 2010 by Rotary Lift. All rights reserved. CO7473.1
Attention!!!
These Instructions Contain General Data. Any Deviation From Customers Prints Or Specifications Should Be
Clarified Before Proceeding With Lift Installation.
IMPORTANT
Check the containment tube for holes due to shipping damage. Do not install a damaged
containment tube. Contact Rotary Lift Customer Service. If the lift has a chance to be exposed to the
elements, protect the lift.
*PLP20447 *
Question and Answer IconNeed help?

Do you have a question about the Rotary Inbay SL210i and is the answer not in the manual?

Rotary Inbay SL210i Specifications

General IconGeneral
BrandRotary
ModelInbay SL210i
CategoryControl Systems
LanguageEnglish

Summary

1. Lift Location

Site Layout and Dimensions

Details lift placement, recommended slope, and model-specific bay dimensions.

2. Excavation

Excavation and Trenching

Instructions for excavating the lift pit and trench for conduit and hoses.

3. Concrete Preparation

Concrete Pouring and Boxing

Guidelines for concrete prep, pipe placement, and area boxing.

4. Lift Setting

Setting and Anchoring

Procedures for setting the lift, including frame anchors and plumbing.

5. Backfill

Backfill and Compaction

Instructions for backfilling around the lift and pipe trench.

6. Concrete Work

Pouring and Keying New Concrete

Guidelines for pouring new concrete around the lift and securing it.

Curing and Final Checks

Procedures for concrete curing, checking level, and final anchor adjustments.

9. Mounting Master Control Panel

11. Supply Lines Installation

13. Fluid Filling

18. Superstructure Installation