EasyManuals Logo

Rotary SM14 User Manual

Default Icon
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
5
WARNING
If you are not completely familiar with automotive lift maintenance procedures, STOP. Contact
factory for instructions.
To Avoid Personal Injury, permit only qualified lift service personnel to perform maintenance on this equip-
ment.
Periodically: Check all column, lift/runway attaching bolts for tightness.
Always raise lift when cleaning floor area with solvents and/or cleaning compounds.
Always keep runways and linkages clean. In salt belt or other corrosive environments, the lift must be
washed down weekly.
Always: Replace slack cable device springs when replacing new cables.
Never: Grease rollers or pins on open yoke lifts.
Daily: Check cables and sheaves for wear. Observe for frayed cable strands. Wipe cables with a rag to de-
tect hard to see small broken cable strands. Replace cables showing any broken strands. Replace worn parts
as required with genuine Rotary parts.
Daily: Inspect front wheel stops and ramp/chocks for damage or excessive wear. Replace as required with
genuine Rotary parts.
Daily: Check locking latch operation and reset. Adjust per instructions or repair if required with genuine
Rotary parts.
Weekly: Clean foreign debris from rear wheel slip plates and turning radius gauges by blowing out with shop
air. DO NOT GREASE BALL BEARINGS.
Weekly: Check torque on the column anchor bolts per specifications .
Monthly: Clean wire rope cables with lift in both lowered and raised position by spraying with penetrating oil and
wiping the cable down.
Monthly: Check cables for ware. Refer to 4-Post Inspection and Maintenance Guide for ware inspection informa-
tion.
Monthly: Check level of runway. Adjust per instructions.
Monthly: Lubricate Guide on each turning radius with a dry film lubricant. Clean and lubricate more often as
conditions warrant.
Semi-Annually: Check fluid level of lift power unit and refill if required. If fluid is required, inspect all fittings,
hoses and seals. Repair as required.
Semi-Annually: Lubricate front wheel stop and ramp/ chock hinge pins.
IMPORTANT
Cable adjustment should be checked by a Rotary Authorized Installer after the first 50 loaded lift
cycles and after 300 loaded lift cycles.
For Rolling Jack Maintenance Instructions see Rolling Jack Installation, Operation and Maintenance Instruc-
tions in the rolling jack box.
MAINTENANCE INSTRUCTION

Other manuals for Rotary SM14

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotary SM14 and is the answer not in the manual?

Rotary SM14 Specifications

General IconGeneral
BrandRotary
ModelSM14
CategoryLifting Systems
LanguageEnglish

Related product manuals