d02880.fm
MAINTENANCE MANUAL
BRP-Powertrain
Effectivity: 912 Series
Edition 2 / Rev. 0
12-20-00
page 58
October 01/2009
Graphic
Inspecting the magnetic plug.
Fig. 28
08565,08566,08564,08563
12.1) Installation of the magnetic plug
Install The following steps are necessary:
Inspect all system for correct function. Detailed inspection of affected
engine components.
acceptable
not acceptable
magnetic plug
Step Procedure
1 Clean the magnetic plug.
2 Refit the magnetic plug. Tightening torque 25 Nm (18.5 ft.lb).
3 Safety wire the plug.