EasyManua.ls Logo

ROUND Pools AMBASSADOR - Level the Foundation Area

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
No Diving or Jumping. Observe all Safety Rules.
1-13
3. Make the Area Flat and Level
a. Replace the centre peg with a at-
topped stake, at least 1” (25 mm)
square and 6” (15 cm) long. Drive it
down ush with the ground surface.
b. Nail one end of a straight 2-by-4
to the top of the stake. Choose the
length of 2-by-4 you need for your
pool from the chart above. Use a nail
long enough to hold the end of the
2-by-4 to the stake while you rotate it
in a circle.
c. Put a carpenters level on the 2-by-4
and swing the board in a circle to nd
the high and low spots.
d. Remove all the high spots with a
shovel, hoe or rake.
e. Be prepared to hire earth moving
equipment if you need to level a large
area. Remember, your pool must be
level across the diameter of the pool.
Remember:
Your pool must be
perfectly level. Take
the time you need to be
sure your foundation is
perfectly level.
Hint:
Use a surveyors transit
instead of a carpenters
level, if one is available.
12
11
13
14