EasyManua.ls Logo

Saba GALA - Page 51

Saba GALA
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 - RUOTARE LA STRUTTURA, POSIZIONANDOSI SOPRA UN PANNO MORBIDO PER EVITARE CHE SI GRAFFI.
CENTRARE I DUE LONGHERONI SULLE FORATURE DEL TELAIO, POI AVVITARE LE VITI.
ATTENZIONE: NON AVVITARE COMPLETAMENTE LE VITI, PER AVER MAGGIOR GIOCO DURANTE IL RESTO
DEL MONTAGGIO.
2 - ROTATE THE FRAME, PLACING IT ON TOP OF A SOFT CLOTH TO AVOID SCRATCHES.
ALIGN THE TWO LONGITUDINAL BARS WITH THE HOLES ON THE FRAME, THEN SCREW IN THE SCREWS.
CAUTION: DO NOT TIGHTEN THE SCREWS COMPLETELY, TO ALLOW MORE FLEXIBILITY DURING THE REST
OF THE ASSEMBLY.
TELAIO
METAL FRAME
VITE
SCREW
MONTAGGIO GAMBE LONGONI
BEAMS ASSEMBLY
Rev.00 - 3