EasyManua.ls Logo

Sam4s SPS-300 Series - Page 6

Sam4s SPS-300 Series
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 • Overview SPS-300 SmartECR Supplement v1.11
Two or More ECR Configuration
Step 1: Using a serial cable, connect the 232A port on the first terminal to the COM 1 port on the first
ECR. Repeat for each additional terminal and ECR.
Step 3: Using the Ethernet cables, connect the ENET LAN port on each of the terminals to the 8-port
switch.
Step 4: Using one of the Ethernet cables, connect Port 8 on the switch to the merchant’s Internet and
power up the switch.
Step 5: Using the terminal’s power adaptor, connect one end to the Power port and the other end to the
power source/outlet. Repeat this step for each additional terminal.
Note: As of April 1
st
, 2020 Sterling/EVO no longer is running the Bridge software.

Other manuals for Sam4s SPS-300 Series

Related product manuals