24
Installation Inspection and Testing
English
Installation
Step 4-1 Performing a drain leak test
1 Pour water into the drain pan.
CAUTION
Make sure that the water does not overflow onto the
electrical connection.
2 Check for leaks at the drain connection under the cover
panel.
<Front view>
3 Make sure that the hose is draining properly at the
outdoor unit.
Step 4-2 Performing the gas leak tests
1 Before inspecting the leakage, use a torque wrench to
close the cap for the stop valve. (Comply with a tightening
torque for each size of the diameter, and tighten the cap
firmly to prevent any leakage.)
Outer diameter (mm)
Tightening torque
Body cap
(N•m)
Charging port
cap (N•m)
ø 6.35 20 to 25
10 to 12
ø 9.52 20 to 25
ø 12.70 25 to 30
ø 15.88 30 to 35
Over ø 19.05 35 to 40
( 1 N•m = 10 kgf•cm )
R-22: Thread of the screw - 7/16-2OUNF
R-410A/R-32 : Thread of the screw -1/2-2OUNF
Charging core
Tightening torque for body cap (Refer to the table)
Spindle
Tightening torque for charging port cap (Refer to the table)
2 Insert inert gas into the pipes connected to indoor and
outdoor units.
3 Test leakage on the connection parts of the indoor and
outdoor units with soap lather or liquid.
Test parts for the
indoor unit
Test parts for the
indoor unit