EasyManua.ls Logo

Samsung IAB Series - 4. FRAME installation and cable connection

Samsung IAB Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
23
Install the wall mount on the wall. (The same method as WALL 2.0)
- Attach the leaflet to the wall to locate the wall mount.
- Check the horizontal state using a laser leveler
- Fix the left and right two points to the wall using the enclosed screw. (According to the leaflet picture)
Fig.1 Using leaflet
Fig.2 using the screw
0
B
A
A
B
C
A
F
4. FRAME installation and cable connection

Table of Contents

Other manuals for Samsung IAB Series

Related product manuals