EasyManua.ls Logo

Samsung IAB Series - 4. FRAME installation and cable connection

Samsung IAB Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
25
What should be done when there is a gap between the LEDs (2x3) in the cabinet
- Check the gap between the cabinet (2x3) LED modules before installation.
- if there is a gap, screw the area of Figure 1 to adjust the height of the low part to the high part.
Fig1. LED module gap adjustment area
Fig.2 into screw
4. FRAME installation and cable connection

Table of Contents

Other manuals for Samsung IAB Series

Related product manuals