EasyManua.ls Logo

Samsung IAB Series - 4. FRAME installation and cable connection

Samsung IAB Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
31
L/R SPK
Cable 연결
Relay
Cable 연결
BN39-
02743B
BN39-
02743B
BN39-
02743A
BN39-
02776A
Cable 고정용
고리 사출물
MAIN
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
Inlet
B’d
Inlet
B’d
Connecting the cable in the frame section below
Connect BN39-02743B (OCM) to Main OCM1 connector, spread it over the L1 frame fixed injection, and hang it.
Connect BN39-02743B (OCM) to Main OCM2 connector, spread it over the L2 frame fixed injection, and hang it.
Connect BN39-02743A (OCM) to Main OCM3 connector, spread it over the R1 frame fixed injection, and hang it.
Connect BN39-02776A (OCM) to Main OCM4 connector, spread it over the R2 frame fixed injection, and hang it.
Mark the OCM cable connection location as SILK at the main b’d OCM connector location
LEFT-FRAME
RIGHT-FRAME
L1 L2 R1 R2
OCM고정
사출물
BN39-02743B
BN39-02743B
BN39-02743A
BN39-02776A
146” Reference
position
110” Reference
position
Fig.1 Main b’d Silk mark
4. FRAME installation and cable connection

Table of Contents

Other manuals for Samsung IAB Series

Related product manuals