LED R&D Lab(VD)
34
Fig.1 Check the operation after installing one
Fig.2 Check the operation after installing two
Fig.3 Check operation after installing three Fig.4 Check operation after installing four
⑪ Check the operation of each ASSY BRACKET P-FRONT installation.
- Connect the power of the SET power cord to check whether the entire LED is damaged or not and check the output.
4. FRAME installation and cable connection