EasyManua.ls Logo

Samsung IAB Series - 4. FRAME installation and cable connection

Samsung IAB Series
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
36
After assembling two or more ASSY BRACKET P-FRONTs, match each other's Z gaps.
< Z gap control method >
- The concept of pushing up the lower side
- Open the distance between the two modules. Figure 1
- Adjust the gap by turning the middle gear using the straight driver. (Right module: upper gear, left module: lower gear) Fig.2
Fig.1 Module Fig.2 Step control method
4. FRAME installation and cable connection

Table of Contents

Other manuals for Samsung IAB Series

Related product manuals