LED R&D Lab(VD)
36
②L/R SPK
Cable 연결
①Relay
Cable 연결
③BN39-
02743B
④BN39-
02743B
⑤BN39-
02743A
⑥BN39-
02776A
Cable 고정용
고리 사출물
MAIN
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
Inlet
B’d
Inlet
B’d
⑧ Connecting the cable in the frame section below
③ Connect BN39-02743B (OCM) to Main OCM1 connector, spread it over the L1 frame fixed injection, and hang it.
④ Connect BN39-02743B (OCM) to Main OCM2 connector, spread it over the L2 frame fixed injection, and hang it.
⑤ Connect BN39-02743A (OCM) to Main OCM3 connector, spread it over the R1 frame fixed injection, and hang it.
⑥ Connect BN39-02776A (OCM) to Main OCM4 connector, spread it over the R2 frame fixed injection, and hang it.
※ Mark the OCM cable connection location as SILK at the main b’d OCM connector location
LEFT-FRAME
RIGHT-FRAME
L1 L2 R1 R2
OCM고정
사출물
BN39-02743B
BN39-02743B
BN39-02743A
BN39-02776A
146” Reference
position
110” Reference
position
Fig.1 Main b’d Silk mark
4. FRAME installation and cable connection