EasyManua.ls Logo

Samsung IAB Series - 4. FRAME installation and cable connection

Samsung IAB Series
169 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
55
BN39-
02743B
BN39-
02743A
BN39-
02776A
MAIN
B’d
SMPS
B’d
SMPS
B’d
SMPS
B’d
Inlet
B’d
OCM fixed
injection
LEFT CENTER RIGHT
Cable connection on the frame side(110 inch)
Connect the BN39-02743B (OCM) to the main OCM2 connector, spread it over the LEFT frame fixed injection, and hang it.
Connect the BN39-02743A (OCM) to the Main OCM3 connector, then stretch it over the CENTER frame fixed injection
BN39-02776A (OCM) is fastened to the main OCM4 connector, and then stretched over the RIGHT frame fixed injection.
Mark the OCM cable connection location as SILK at the main b’d OCM connector location
BN39-02743B
BN39-02743A
BN39-02776A
146” Reference position
110” Reference position
Fig.1 Main b’d Silk
Form the cable under the
insulator
4. FRAME installation and cable connection

Table of Contents

Other manuals for Samsung IAB Series

Related product manuals