CDCHANGERREPLACEMENT
10. SETTING UP THE TRAY HOLDER AND UP/DOWN DRIVE GEAR
UP/DOWN DRIVE GEAR
1
-
1.
2.
3.
4.
5.
6.
7.
Loosen and install the SET SCREW of the SENSOR P.W.B.
Slide the TRAY HOLDER SLIDE forward until it goes no
further.
Align the round mark on the UP/DOWN DRIVE GEAR 1
with the mark area on the TRAY HOLDER SLIDE, and install.
Secure the screw.
As shown in the figure, place the UP/DOWN DRIVE GEAR
2 and UP/DOWN CAM GEAR 2
insuch
a way that they are
horizontal.
UP/DOWN CAM GEAR 2
l Set the parts in such a way that the round marks on the two
GEARS are horizontal.
Align with the triangular mark through the hole through which
the UP/DOWN CAM GEAR 2 teeth are visible.
Secure the SCREW of the SENSOR and GEAR.
Q
I
MARK
11. TRAY HOLDER SLIDE
UP/DOWN MOTOR
ASSY-
UP/DOWN DRIVE GEAR 2
10.5mm
r”ll
-f-
I
J
(6142670440)
-----------_-_-_
t;zoL
1
MOLYKOTE, EM-SOL
I
I
SG-7
SAN GREASE, SG-7
I
I
G-4748 FLOIL OIL, G-4748
I
L
-----_---_-_-_-_
_J
CD MECHANISM ADJUSTMENTS
1.
REPLACEMENT AND LUBRICATION OF THE CD MECHANISM
p”
i
@&TURNTABLE
2. CD BASE MECHANISM
SPINDLE MOTOR
SLED RETARD GEAR
l-
SLED RETARD GEAR 2
PICK RACK GEAR
MOTOR B LIMIT SW P.W.B
SLED