3
Schedule Timer
Power Outages
If the air conditioner is running when power is lost, the air conditioner remains OFF when power is restored. Also, if remote con-
troller operation was disabled when power was lost, it is enabled for a few minutes when power is restored.
Programmed operations scheduled for times that come after power is restored run as usual.
Program settings are retained in the non-volatile memory of the schedule timer, therefore they are not cleared in the event of
a power outage. Also, the present time and today's day of the week are retained for a maximum of 100 hours by the internal
battery.
Schedule timer settings (Example)
Operation when power is not lost
*1 Whether remote controller operation is enabled or disabled depends on the setting of the
previous day.
Operation when power is lost at 15:00 and subsequently restored
Air conditioner
operation
Remote controller
operation
Air conditioner
operation
Remote controller
operation
*1 Whether remote controller operation is enabled or disabled depends on the setting of the
previous day.
*2 Remote controller operation is enabled for a few minutes after power is restored.
*1
8:00 12:00 17:00 20:0013:00 18:00
Stopped StoppedStopped
Running Running
Enabled
Enabled
Disabled
Disabled
Running
Stopped
*2
8:00 12:00
17:00 20:0013:00 18:00
*1
Stopped
Stopped
Stopped
Running Running
Enabled EnabledDisabled Disabled
Running
Disabled
Stopped
Power outage