EasyManua.ls Logo

Satec PM130 PLUS Series - Page 87

Satec PM130 PLUS Series
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Configuring the PM130 PLUS General Meter Setup
PM130 PLUS Powermeter Series_Installation Operation and Manual 87
Display
Label
Parameter
Options
Default
Description
nd.P
The number of
blocks in the sliding
demand window
E,
EH
1-15
1
The number of blocks to be averaged for sliding
window demands
Ad.P
Volt/Ampere
Demand Period
0-1800 sec
900 sec
The length of the demand period for ampere and
volt demand calculations
Always specify the wiring mode and transformer ratings prior to setting up setpoints and
analog outputs.
The maximum value for the product of the phase CT primary current and PT ratio is
57,500,000. If the product is greater, power readings are zeroed.
Figure 5-6: General Setup Dialog Box Basic Setup Tab
Table 21 lists the available wiring modes.

Table of Contents

Related product manuals