EasyManua.ls Logo

Saturn S Series - Page 126

Saturn S Series
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
6-23
Procedure 6
Flow Time Calibration
No
Yes
Yes
No
WARNING: Refer to Ink Maintenance Flow Charts on
page 6-16 before performing ink
maintenance procedures.
Start
Switch on the
power supply.
Ensure the ink tank
has no less than
400 ml ink. Push the
tray into the printer.
Enter <Ink
System-2> select
‘Flow time
calibration’ to start
calibration.
The viscosity value
will be calculated
after 4 minutes later.
Ensure the printer
refresh the
parameter
automatically, select
EXIT to finish
calibration.
If all the three test
value is “0”, select
CANCEL to exit,
turn to procedure 5,
and then perform
calibration again.
Whether all
the three test
value is “0”?
Enter Nozzle Drive
Setup (Procedure 8
)
Whether the
difference
between 3
tests is less
than 50?
Figure 6-16. Flow Time Calibration (Procedure 6)

Related product manuals