EasyManua.ls Logo

Saturn S300 Series - Page 125

Saturn S300 Series
167 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
6-22
Procedure 5
Flushing Viscosimeter
WARNING: Refer to Ink Maintenance Flow Charts
on page 6-16 before performing ink
maintenance procedures.
Start
Switch off the
power supply.
Select Manual
Control” in
<System
Maintenance>.
Open PUMP,
AGITATION in turn.
Close AGITATION,
PUMP in turn afte
r
one minute later.
Use a container to
hold the pipe with
blue mark. (Refer to
Figure 6-12)
Open Pump,
Churn Valve in
turn; close
them until all
the ink flow out
from
viscometer.
Place ink tank
cap into a
beaker which
with 150 ml
make-up inside
(refer to Figure
6-25, Page
Return to
Figure 6-10.
Figure 6-15. Flushing Viscosimeter (Procedure 5)

Related product manuals