EasyManua.ls Logo

Sauer LASERTECH 40 - Page 23

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Planning, transport, installation
LASERTEC 40
Page 22
What is the purpose of this documentation?
This documentation is aimed at the people responsible for the
transportation, positioning and installation of the machine and their staff.
They will then be in a position to prepare the installation location and its
surroundings so that the machine can be installed and connected
immediately on delivery.
The data given in these instructions apply to the machine, chip tray, chip
conveyor and series transformer.
For transport information and installation instructions on other peripheral
equipment, see the related information from the manufacturer.
Only the basic installation is performed. The machine is still not ready to
operate. All other tasks (alignment, completing the machine, filling with oils
and greases and initial commissioning) will be undertaken by authorised
commissioning engineers.