EasyManua.ls Logo

Secure Liberty 100 - Page 70

Secure Liberty 100
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 70 of 116
Liberty 100 Smart Electricity Meter Technical Reference Manual
BGX501-767-R02
Auto Scroll Display in Prepayment Mode
Followed by value
Followed by
in the meter account).
Title: Current usage
Followed by value
Followed by
The 3
rd
set displays the current electricity consumption.
The example shows that 78.1 kWh of electricity is currently
being used.
Title: Current cost
Followed by value
Followed by
The 4
th
set displays the current cost of electricity
consumption.
The example shows that £51.00 is the current cost of
consumption.
Title: Number of days left
Followed by value
Or
Or
Or
Or
The 5
th
set displays the number of days left before the credit
in the meter is exhausted.
The example display shows the following:
33 days left or more than 99 days left or less than one day
left or there is no credit left in the meter account.
‘No Data’ will be displayed when the meter is unable to
predict the number of days left; for example, if there is no
consumption after the meter has been installed then the
Days Left’ title will be followed by the ‘No Data’ value.

Table of Contents

Other manuals for Secure Liberty 100

Related product manuals