ASSEMBLY AND INSTALLATION
14 15
ASSEMBLY AND INSTALLATION
6 6
020-000612-0C M6X12 SKT CAP CRM (2)
030-000830-SB M8x30 BLT W/S BLK (4)
030-000635-S M6x35 BLT W/S PAS (9)
These xings are located within their respective
xing points within the cabinet.
These xings are located within their respective
xing points within the cabinet.
These xings are located within their respective
xing points within the cabinet.
These xings are located within the cashbox
068-852216-0B M8 WSHR 22OD FLT BLK (4)
Required xings and where to nd them.
Fixings required for Billboard Installation.
Fixings required for Snake Body installation (located within the Snake Body segments)
Tools required for installation
• Billboardweighsapproximately10kgonceassembled.Haveatleast2people
duringthisoperation.Workingalonecouldresultinpersonalinjuries,etc.
• Toperformworksafelyandsecurely,besuretoprepareastepwhichisina
safeandstablecondition.Performingworkwithoutusingastepmayleadtoinjury
ofdamagetocomponents.
Allen Key nos 4, 5 and 6 (M5) (M6) (M8)
- Attaching Billboard Panel to Assy Billboard.
Adjustable Spanner / Wrenck
- Adjust Leg Levellers
M8 Socket wrench or Spanner
- Attaching Billboard
Step or Step Ladder
6-1 INSTALLING THE CABINET