EasyManua.ls Logo

Sharp 13VT-R100 - Page 37

Sharp 13VT-R100
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
13VT-R100/R150
13VT-CR10
INSTALLING THE SHIFTER
Figure 1-42.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point 2
Insert
point 1
Half round notch
Shaft 1
Round mark
Loading gear (T)
Insert
point 3
Insert
point 2
Insert
point 4
Insert
point 6
Release
point 3
Shaft 1
Shaft 1
Shaft 2
1. Make sure that the loading gear is at the point 1 as
shown below.
2. Install, paying attention to 6 insertion points and 3
release points.
3. For the phase matching at the insertion point 1, see
the point 2 as shown below.
4. Finally fix the inserts 1 and 4.
Figure 1-43.
Rotation
point 2
Phase-matching
point 1

Other manuals for Sharp 13VT-R100

Related product manuals