EasyManua.ls Logo

Sharp FDD-412A - Page 61

Sharp FDD-412A
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FDD412A/B
2
Parts
Replacement
Procedures
&.2.1
Common
Work
1:
Top
Cover
(1)
Tools
and
measuring
instruments
to
be
used:
None
(2)
Disassembling
Disengage
the
cover
off
the
guide
at
the
inset
in
the
order
1%4
shown
in
Fig.
4.1.
The
removal
is
made
easier
by
applying
force
in
the
arrowed
directions.
ss
The
cover,
being
of
molding,
should
not
be
subjected
to
undue
strain.
(3)
Assembling
Check
that
the
indicator
lamps
align
with
guide
holes
on
the
cover.
Push
the
cover
down
to
fit.
Indicator
lamp
Fig.
4.1
Top
Cover
4.2.2
Common
Work
2:
Plate
Opening/Closing
(1)
Tools
and
measuring
instruments
to
be
used:
-
#2
Phillips
screwdriver
(2)
Disassembling
(a)
Remove
the
top
cover
as
per
the
procedure
described
in
4.2.1.
(b)
Remove
shutter
get
screws
(M32),
and
dismount
the
shutter
by
pushing
it
to
the
left
(Fig.
4.2).
(c)
While
keeping
the
head
load
bail
steady
by
hand,
remove
the
spring
(bail)
set
screw
(M3
tapping
x1)
and
take
out
the
-
spring.
(d)
Push
the
door
button
to
open
the
plate.
(3)
Assembling
(a)
Engage
the
plate
fulcrum
spring
through
spring
guide
holes
and
close
the
plate.
-