EasyManua.ls Logo

Sharp FDD-412A - Page 64

Sharp FDD-412A
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FDD412A/B
4.2.4
PWB
Assembly
(FCC14)
(1)
C2)
C3)
(4)
4.2.5
(1)
(2)
Tools
and
measuring
instruments
to
be
used:
#2
Phillips
screwdriver
Disassembling
(a)
Detach
PWB
set
screws
(M4
x
2).
(b)
While
extracting
the
PWB
from
the
DD
motor
guide,
detach
connectors
A,
B
and
C.
(Keep
for
future
use
the
insulating
plate
inserted
between
PCB
and
base.)
Assembling
(a)
Insert
connectors
A,
B
and
C
into
the
PWB.
All
the
connectors
are
each
equipped
with
an
alignment
key.
Check
the
orienta-
tion
upon
insertion.
(b)
Insert
the
PWB
into
the
DD
motor
guide,
and
secure
it
with
the
PWB
set
screws.
(Have
the
insulating
plate
hole
align
with
the
PWB
set
holes.)
Adjustment
(a)
After
replacement,
set
the
mode
according
to
3.2,
"Setting
of
FDD
Operation
Mode".
Connector
A
Connector
B
(P3)
PCB
(FCC14)
PCB
set
screw
Connector
C
(P5)
=
Fig.
4.6
PCB
(FCC14)
Motor
(DD
Spindle)
Tools
and
measuring
instrument
to
be
used:
#2
Phillips
screwdriver
Disassembling
(a)
Remove
the
top
cover
as
per
the
procedure
in
4.2.1.
(b)
Open
the
plate
as
per
the
procedure
in
4.2.2.
(c)
Remove
the
PCB
as
per
the
procedure
in
4.2.4.
—58~—