EasyManua.ls Logo

Sharp FDD-412A - Page 67

Sharp FDD-412A
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FDD412A/B
Clean
paper
/
=>
ci
i
|
|
is
Portion
A
ou
¥
Swing
arm
Portion
B
Bail
assembly
Head
load
solenoid
Bail
set
screw
Fig.
4.9
Head Load
Bail
Assembly
4.2.8
0
Sensor
Assembly
(1)
(2)
(3)
(4)
Tools
and
measuring
instruments
to
be
used:
#2
Phillips
screwdriver
Small
flat
screwdriver
(for
wire
removal)
Disassembling
(a)
Remove
the
PWB
according
to
4.2.4.
(b)
Remove
the
O
sensor
wiring
off
the
J3
connector
according
to
Gx
2eds
(c)
Detach
a
0
sensor
assembly
set
screw
(M4
x1).
Assembling
(a)
Attach
the
O
sensor
assembly.
Press
the
plate
in
the
arrowed
direction
(Fig.
4.10)
and
secure
it
temporarily.
(b)
Install
wiring
according
to
4.2.3
(wire
routing
shown
in
Fig.
4.5).
(ce)
Install
the
PWB
according
to
4.2.4.
Adjustment
(a)
After
replacement,
perform
adjustment
according
to
4.3.2,
"OQ
Sensor
Position
Adjustment".
QO
sensor
assembly
Set
screw
Base
Fig.
4.10
0
Sensor
Assembly
—~61—