EasyManua.ls Logo

Sharp TMV Series - Page 16

Sharp TMV Series
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
2. Replacement of speed change belt(R) (Figure 10):
a. Please refer to Step a to e on motor dismantling
on P.15.
b. Pull out drawbar (1).
c. Take off three concave hexagonal bolts (1) and
use two of them to push up the bearing cover
(K).
d. Take down the two concave hexagonal bolts (L)
setting the pressboards from the top and take
out the bolt housing (M).
e. Take off the six concave hexagonal bolts (N).
f. Use a soft mallet to hit the belt housing (Q)
lightly upward so as to disengage it from the
gear housing (P).
g. Reverse the order of dismantling to restore the
assembly once the speed change belt is replaced.
Note: Replacing speed change belt shall conform to that of our
company specifications.

Related product manuals