2 Starting GC/MS
10 GCMS-QP2010 Series Operation Guide
2.5
Vacuum System Startup
Open the carrier gas cylinder valve to supply carrier gas.
If carrier gas is being controlled by accessory/peripheral equipment, use that equipment to supply carrier
gas before starting the vacuum system.
1
Click the [Vacuum Control] icon on the [Real Time] assistant bar.
The [Vacuum Control] window opens.
2
Click [Auto Startup].
The vacuum system starts.
3
When [Completed] is displayed, click [Close].