EasyManua.ls Logo

SICK DUSTHUNTER C200 - Page 36

SICK DUSTHUNTER C200
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
8011952/YWL2/3-0/2016-08| SICKOPERATING INSTRUCTIONS | DUSTHUNTER C200
Subject to change without notice
3 ASSEMBLY AND INSTALLATION
Fig. 18: Clearance for sender/receiver unit and reflector/scattered light receiver (dimensions in mm)
Remove insulation (when fitted)
Cut suitable openings in the duct wall; bore large enough holes in brick or concrete
stacks (flange tube diameter (see “Flange with tube”, page 117)
)
Insert the flange with tube in the opening so that the “Top” marking points upwards.
Align the flanges with tube roughly to each other and weld on with a few welding spots
(on the anchor plate for brick or concrete stacks, insert junction plates for thin-walled
ducts).
Use a suitable tube (for narrower ducts) or the adjusting device from SICK to align the
flange tubes to each other exactly after welding; axes deviation to each other max. ± 1°.
TOP
a 400
600 300 200
Flange with tube
Duct wall
Component a
Sender/receiver unit 400
Reflector/scattered light receiver 350
NOTE:
Do not let separated pieces fall into the duct.

Table of Contents

Related product manuals