36
8011952/YWL2/3-0/2016-08| SICKOPERATING INSTRUCTIONS | DUSTHUNTER C200
Subject to change without notice
3 ASSEMBLY AND INSTALLATION
Fig. 18: Clearance for sender/receiver unit and reflector/scattered light receiver (dimensions in mm)
▸ Remove insulation (when fitted)
▸ Cut suitable openings in the duct wall; bore large enough holes in brick or concrete
stacks (flange tube diameter (see “Flange with tube”, page 117)
)
▸ Insert the flange with tube in the opening so that the “Top” marking points upwards.
▸ Align the flanges with tube roughly to each other and weld on with a few welding spots
(on the anchor plate for brick or concrete stacks, insert junction plates for thin-walled
ducts).
▸ Use a suitable tube (for narrower ducts) or the adjusting device from SICK to align the
flange tubes to each other exactly after welding; axes deviation to each other max. ± 1°.
a 400
600 300 200
Flange with tube
Duct wall
Component a
Sender/receiver unit 400
Reflector/scattered light receiver 350
NOTE:
▸ Do not let separated pieces fall into the duct.