EasyManua.ls Logo

Siemens-Allis Static Trip II - User Manual

Default Icon
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
.r
.
SIEMENS-ALLIS
Switchgear
INSTRUCTIONS
STATIC TRIP II
OVERCURRENT TRIP DEVICES
USED WITH
TYPE LA POWER
CIRCUIT
BREAKERS
18X4827-03
March,1978
Question and Answer IconNeed help?

Do you have a question about the Siemens-Allis Static Trip II and is the answer not in the manual?

Summary

Introduction

Warranty Information

Summary of warranty terms and conditions.

Device Overview

Description of Static Trip II devices and their components.

Device Description

General Characteristics

Static Trip II devices are static, use semiconductors, and operate based on current.

Trip Device Components

Enclosure, electronic circuits, and tripping actuator of the Static Trip II device.

System Components

Overview of the static overcurrent trip system including CTs and actuator.

Handling and Removal

Procedures for removing Static Trip II units from circuit breakers.

Static Trip II Device Types

Type TI and TIG Variants

Dual trip devices for phase overcurrent and ground fault protection.

Type TS and TSG Variants

Selective trip devices for phase and ground fault protection with time delay.

Type TSI and TSIG Variants

Triple selective trip devices for phase and ground fault with time delay and instantaneous elements.

Time-Current Curves

Graphical representation of trip device timing characteristics based on current.

Settings and Operation

Performance Characteristics

Stability, repeatability, and tolerance to ambient conditions of Static Trip II.

Calibration and Adjustment

Details on using knobs and switches for setting device parameters.

Wiring Configurations

Schematics for connecting Static Trip II devices to circuit breakers.

Rating and Settings Table

Static Trip II Rating Table

Table of ampere settings for various tripping transformer ratings.

General Notes

Explanations for rating table values, pick-up settings, and time bands.

Testing Procedures

Secondary Current Testing Overview

Method for testing Static Trip II using secondary current injection.

Portable Test Set Usage

Instructions for using a portable test set for device verification.

Test Connections

Diagrams and instructions for connecting test equipment to the device.

Specific Test Procedures

Long Time Pick-up Test

Verifying the pick-up current for the long time element.

Short Time Pick-up Test

Verifying the pick-up current for the short time element.

Ground Pick-up Test

Verifying the pick-up current for the ground fault element.

Advanced Trip Testing

Instantaneous Trip Test

Testing the instantaneous tripping function of the device.

Time Delay Tests

Testing long time, short time, and ground time delays.

Tripping Actuator Verification

Testing the circuit breaker's tripping actuator for proper function.

Component Verification

Tripping Transformer Testing

Procedures for testing current transformers for continuity and excitation.

Continuity and Excitation Tests

Specific tests for transformer windings and wiring integrity.

Primary Current Testing

Exciting Current Test Limits

Limits for exciting current during transformer testing.

Primary Injection Testing

Testing the entire system using primary current applied to the breaker.

Maintenance and Repair

Repair Recommendations

Guidance on handling device repair and not field-repairing.

Restoring Calibration

Procedure for recalibrating knobs if they become misaligned.

Cleaning Instructions

Steps for safely disassembling and cleaning the Static Trip II unit.

Siemens-Allis Static Trip II Specifications

General IconGeneral
BrandSiemens-Allis
ModelStatic Trip II
CategoryIndustrial Equipment
LanguageEnglish