EasyManua.ls Logo

Siemens ADVIA 2400 - Running an Interrupt (STAT) Sample

Siemens ADVIA 2400
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating the System 81
5. Select Temp.cup/tube select to change container types and select samples for
priority processing.
You can select more than one position at a time and to assign the same container type
to all.
6. To begin the run, select
Start.
From the optional universal rack handler or external transport
1. Select the second General smp. Analyze box (below Out side analyze).
2. To begin the run, select
Start.
3. Load the racks on the rack handler or the universal rack handler.
Running an interrupt (STAT) sample
Running an interrupt sample when sampling is in progress (START)-SMP
LOAD NG
1. Download or create the sample workorder and select
Interr. (interrupt) option on the
workorder.
NOTE: You can also select the priority using the Cup/Tube Assign window if the
sample is already on the sample tray and already has a workorder.
2. At the Operation Panel, select Pause to halt sampling.
3. Load the new sample on the sample tray (STT).
4. At the Operation Panel, select
Start to resume sampling.
Running an interrupt sample when sampling has stopped (STOP)-SMP
LOAD OK
1. Select Interr. (interrupt) option on the sample workorder.
2. Load the sample on the sample tray (STT).
NOTE: Priority can be set using workorder Interr. designation and the Cup/Tube
Assign or Sample confirmation window that displays after reading the barcoded
samples.
3. To begin sampling, at the Operation Panel, select
Start.

Table of Contents

Other manuals for Siemens ADVIA 2400

Related product manuals