EasyManua.ls Logo

Siemens C62 - Making a Phone Call; Dialing and Call Management

Siemens C62
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SIEMENS PTE LTD
C62 Level 2 Service Manual
Copyright © Siemens Pte Ltd. C62 Level 2 manual V1.1
All Rights Reserved
ICM MP CCQ SLI RHQ 19 of 47 Internal Use Only
Step 18 (Receiver)
Take a new receiver and mount it.
Step 19
Place the PWB onto the A-cover by laying
down the top part first.
Step 20
Then lay down the lower part of the PWB.
Step 21
Ensure the correct alignment with the pins
in the A-cover and the corresponding holes
in the PWB.
Step 22
Place the B-cover assembly onto the top of
the PWB and align the B-cover to the A-
cover. Check that the B-cover housing is
ok and all the components are in their
places.
Step 23
Place the five (5) screws in the holes and
tighten in the order shown, 1 first and 5 last.
Set torque to 20 Ncm.

Other manuals for Siemens C62

Related product manuals