Connection
4.12 Connecting the Power Module with the CM PM-E Direct Connection Module
ET 200pro distributed I/O system
130 Operating Instructions, 03/2013, A5E00335544-08
Connecting the Power Module with the CM PM-E Direct Connection
Module
Introduction
Connect the 2L+ load voltage supply to the screw terminals of the CM PM Direct connection
module. You can use additional terminals to loop through the load voltage supply.
● The power module and bus module are mounted on the rack.
● Wiring rules for the 2L+ load voltage supply screw terminals:
Screw terminals for the supply
voltages
Connectable conductor
cross-sections of flexible
2
With end sleeve 0.14 to 2.5 mm
2
Number of conductors per terminal
Stripped length of the cable insulation
End sleeves according to
DIN 46228
Without insulating collar
Design A, length up to 12 mm
Design E, length up to 12 mm
● Cross-tip screwdriver, size 2
● Screwdriver with 3 mm blade
● 25 mm open-end wrench