3.4 Options
3.4.1 ALUM4
3.4.2 EXM
3.4.3 GEE8
3.4.4 GEE12 / GEE16 / GEE50
3.4.5 MPPI
3.4.6 OPA
3.4.7 PFT1 / PFT4
3.4.8 REAL
3.4.9 STRB
3.4.10 V24/1 / V24/2
3.4.11 V24 adapter
3.4.12 V.24 cable
3.5 Using boards from Hicom 150 E / Hicom 100 E
4 Installation
4.1 Installation of Hicom 150 E OfficePro
4.1.1 Overview
4.1.2 Installation procedures
4.1.3 Selecting the installation site
4.1.4 Unpacking the components
4.1.5 Mounting the main distribution frame MDFU / MDFU-E
4.1.6 Setting up the system cabinets
4.1.6.1 Overview
4.1.6.2 Removing the cabinet cover
4.1.6.3 Setting up a single-cabinet system
4.1.6.4 Setting up a two-cabinet system (stacked)
4.1.6.5 Setting up a two-cabinet system (side by side)
4.1.6.6 Setting up a three-cabinet system (stacked)
4.1.7 Earthing the system
4.1.8 Checking the protective earth
4.1.9 Connecting the cables
4.1.10 Laying the line network and setting jumpers on the MDFU/MDFU-E
4.1.11 Loading the system software
4.1.12 Configuration information
4.1.12.1 Inserting/removing boards
http://cmweb01.mch.pn.siemens.de/e_doku/en/h150/h15/30/sh/2/index.htm (3 of 16) [06/04/2000 13:02:10]