INHAB™ ENERGY INSTALLATION GUIDE 
Step 7(a): Two empty breakers
and two Main CTs
Common in split phase homes
Secure the White (N) and Blue (L) wires from the wire harness to the neutral bus
bar. Turn off two vertically adjacent (stacked) single pole breakers and secure the
Black (L) and Red (L) wires from the harness to each of the hot leads from each
breaker.
Any empty breaker size can be
used in this scenario (not limited
to 15A)
DANGER
Hazardous Voltage
Will cause death or serious injury.
Turn off and lock out all power supplying this device before working on
this device. Replace all covers before power supplying this device is
turned on.